Day 4 of the build - yet MORE panel fitting
Thursday 20th September 2007
The battery tray was fitted, along with the driver's side tunnel panels. The panel at the end of the tunnel (by the pedals) was cut and ready but I am unsure on the positioning of the floor mounted pedals and associated brackets. I will work out the pedal positioning and drill / tap / assembly these first before bonding and riviting the end panel.